An Integrated Engineering‒Valuation Model for Mixed-Use Developments: A Personal Applied Research Contribution to UK Building Safety, Lifecycle Resilience & Sustainable Decision-Making By Parth Kohli MCIArb, MSc, AssocRICS, RICS Registered Valuer, PMP, MRPSA- Director – Crestline Valuers & Estates (RICS-Regulated Firm)
PROJECTS
Project 1 – £180m Mixed-Use Development (UK)
Summary
• A large regeneration scheme with residential towers, commercial podium and critical
infrastructure. Responsible for valuation engineering, building pathology, risk analysis and
investment due diligence.
Engineering Contribution
• Led valuation engineering aligned with RICS Red Book.
• Performed building pathology (façade anchoring, structural deformation, waterproofing).
• Conducted lifecycle modelling using deterioration curves & 30-year maintenance cycles.
• Designed Crestline’s Engineering–Valuation Model, now a firm-wide tool.
Impact
• Helped secure £40m in funding.
• Improved technical certainty of cost, risk, and lifecycle analysis.
• Identified engineering issues early, enabling negotiation leverage.
• Raised internal professional standards.
Project 2 – £200m Infrastructure Dispute (UK/Middle East)
Summary
• A dispute involving major delay, variation, cost and technical inconsistencies requiring
engineering-led quantum analysis.
Engineering Contribution
• Delay engineering using critical-path deviation tracking.
• Quantum modelling based on construction cost and design changes.
• Drafted expert documentation used for arbitration strategy.
Impact
• Reduced arbitration exposure by 35%.
• Improved clarity between stakeholders.
• Strengthened negotiation and settlement outcomes.
Project 3 – High-Rise Structural Defect Analysis
(India)
Summary
deviation.
• 30-storey tower facing façade failure, RCC cracks, waterproofing failure and settlement
Engineering Contribution
• Performed pathology inspection and structural diagnostics.
• Mapped root-cause pathways of water ingress and load transfer issues.
• Designed engineering remediation plan for structural safety.
Impact
• Cut long-term maintenance cost by 22%.
• Improved structure reliability and safety compliance.Project 4 – 50-Acre Integrated Township (India)
Summary
• A multi-phase township with utilities, roads, commercial areas and housing clusters.
Engineering Contribution
• Cost engineering for multi-phase procurement.
• Structural/infrastructure specification review.
• Construction methodology and phasing improvements.
Impact
• Reduced overrun risks significantly.
• Strengthened contractor evaluation and selection.
• Improved year-one delivery accuracy.